Holy Spirit Retreat Center, Kuntunse

8th January 2020

 

Dear Child of God,

ADSC Fund-Raising – “Friend of the Holy Spirit Retreat Centre” at Kuntunse- Accra

Glory to God in the highest and peace on earth to men of goodwill.

Another year has begun and the effort of the Catholic Charismatic Renewal to build the Holy Spirit Retreat Centre at Kuntunse near the satellite station in the Accra Archdiocese is rekindled.  The Accra Archdiocesan Service of Communion therefore wishes to invite you as a “Friend of the Holy Spirit Retreat Centre”. As a Friend, we require that you offer to this worthy course of building the retreat centre some monthly financial support of Ghc100.00 or more.

Additionally, Friends could make payments to the ADSC Account as and when a Friend so wishes. We are glad to receive any other donations or contributions either in cash or in kind at your convenience. For this purpose, please find below the account details:

Bank Account Details

Account Name: Catholic Charismatic Renewal – Accra

Account Number: 0433114503449801

Bank Name: Ecobank Ghama Limited

Bank Branch: Kotobabi

The Registered Mobile Money Number is 055 309 2115

 

THE PROJECT

A land area of about 4 acres has been developed into a two storey building and a auditorium to seat 1,000 people. The future plan is to provide two blocks of residential units of ensuite rooms that each accommodate one, two or four person and dormitories to accommodate up to 200 persons. The future plans as indicated above is yet to be designed and costed.

The existing two storey building has:
– 2 conference halls

– 5 bedrooms with ensuite washroom facilities
– 4 bedrooms and 4 dormitories with shared washroom facilities
– 1 kitchen

Outstanding works on the existing two storey building are:
– Floor tiling works of the first floor estimated at                              GH¢  25,000.00

– Re-painting works estimated at                                                         GH¢  40,000.00

 

Furnishing
– 10# single-size beds at GH¢ 700.00 each                                       GH¢    7,000.00

– 10# one & half size beds at GH¢ 800.00 each                                GH¢    8,000.00

– 40# single-size monkey beds at GH¢ 900.00 each                        GH¢  36,000.00

– 500# pieces of chairs at GH¢ 150 each                                           GH¢  75,000.00

– 50# single-size 8” HD mattress at GH¢550.00 each                      GH¢  27,500.00

-10# one & half size HD mattress at GH¢ 620.00 each                    GH¢    6,200.00

– 1# fridge                                                                                                 GH¢    4,000.00

– 1# freezer                                                                                               GH¢    3,000.00

– 1# microwave                                                                                        GH¢       900.00

– 2# LPG 16kg fibre cylinders                                                                GH¢    1,800.00

 

  1. OUTSTANDING WORKS ON THE PROPOSED AUDITORIUM ARE OUTLINED BELOW AS PER SUMMARY OF MATERIAL ESTIMATES

Substructure                                                                                          GH¢  48,186.25

In situ Concrete/Large Precast Concrete                                          GH¢    6,038.34

Masonry                                                                                                  GH¢    1,164.24

Structural/Carcassing Metal/Timber                                                 GH¢ 173,250.00

Cladding/Covering                                                                                GH¢   17,345.79

Sub – Total (A)                                                                                        GH¢ 245,984.62

 

  1. OUTSTANDING WORKS ON THE PROPOSED AUDITORIUM ARE OUTLINED BELOW AS PER SUMMARY OF LABOUR ESTIMATES

1. WORKS IN FOUNDATION TO GROUND FLOOR                             GH¢   94,956.59

2. SUPERSTRUCTURE – CONCRETE WORKS                                     GH¢    8,518.13

3. BLOCK WORK                                                                                     GH¢    3,349.50

4. ROOF WORK                                                                                      GH¢  116,193.00

Sub – Total (B)                                                                                       GH¢  223,017.22

 

GENERAL SUMMARY

A. MATERIALS ESTIMATE                                                                   GH¢ 223,017.22                                                

B. LABOUR ESTIMATE                                                                          GH¢ 245,984.62

TOTAL ESTIMATED COST OF OUTSTANDING WORKS                  GH¢ 469,001.84
Attached are some pictures of the current state of the project.

Thank you and God richly bless you, keep you and make you a blessing.